Waterloo North Hydro

Waterloo North Hydro

1.0

(1 Review)

Write a Review

300 Northfield Dr, Waterloo, ON, N2J 4G8

519-886-5090

Listed In: Municipal Government

1.0

1 Review

Write a Review
gatek

By gatek on November 4, 2018 Verified by Email

As an electrical contractor I requested and scheduled Waterloo North Hydro to remove and re-intall the electrical meter. They charge $85 for this service whereas Kitchener Hydro, Cambridge Hydro, and Guelph Hydro do not. Furthermore on the day the panel is being changed you must phone them by 2:30 in the afternoon to tell them that the electrical inspector has not arrived yet. If you do not phone them by that time then they will charge you overtime rate to re- install the meter. But they know that the electrical inspector always phones them immediately after an inspection to authorize them to re-install the meter and the time of the call is recorded. So, when I couldn't phone them in time I was charged overtime rate that amounted to $374.00. The meter was re-installed by 5 pm. No other utility charges for overtime or anything to remove or re-install a meter. In fact once upon a time Kitchener Hydro re-installed a meter at 8 pm and did not charge anything for their service. Waterloo North Hydro is the greediest hydro utility of them all.

Write a Comment

gatek

By gatek on November 4, 2018 Verified by Email

As an electrical contractor I requested and scheduled Waterloo North Hydro to remove and re-intall the electrical meter. They charge $85 for this service whereas Kitchener Hydro, Cambridge Hydro, and Guelph Hydro do not. Furthermore on the day the panel is being changed you must phone them by 2:30 in the afternoon to tell them that the electrical inspector has not arrived yet. If you do not phone them by that time then they will charge you overtime rate to re- install the meter. But they know that the electrical inspector always phones them immediately after an inspection to authorize them to re-install the meter and the time of the call is recorded. So, when I couldn't phone them in time I was charged overtime rate that amounted to $374.00. The meter was re-installed by 5 pm. No other utility charges for overtime or anything to remove or re-install a meter. In fact once upon a time Kitchener Hydro re-installed a meter at 8 pm and did not charge anything for their service. Waterloo North Hydro is the greediest hydro utility of them all.

Write a Comment

Powered by Opio

Waterloo North Hydro 1.0 out of 5.0 based on 1 user review.

Waterloo North Hydro
300 Northfield Dr, Waterloo, ON
Get Directions

Additional Locations See All

Waterloo North Condo Corp

Waterloo North Condo Corp

225 Harvard Pl #37, Waterloo, ON (4 Km Away)

0.0

(0 Reviews)

Waterloo North Presbyterian

Waterloo North Presbyterian

685 Highpoint Ave, Waterloo, ON (4 Km Away)

0.0

(0 Reviews)

Waterloo North Mennonite Chr

Waterloo North Mennonite Chr

100 Benjamin Rd, Waterloo, ON (3 Km Away)

0.0

(0 Reviews)

Own this Business Get Verified

Report Incorrect Data Make an Update